Pier.Studio

PierLogo

Services

01

Architecture

  • Architectural Album
  • Structural Project
  • Structural Expertise
  • Geology
  • Geological Expertise
  • Topography
  • Valuation
  • Transport Networks
  • Regulation 41
  • Expertise of Regulation 41
  • Construction Organization Project (POSI)
  • Energy Efficiency
02

MEP Engineering Communications

  • Water Supply
  • Drainage
  • Heating
  • Cooling
  • Ventilation
  • Sewage
  • Gasification
03

Design

  • Conceptual Design
  • Interior Design
  • Landscape Design
  • Lighting Design
  • Monumental Design
  • Web Design
04

Authorial Supervision

Monitoring the actual implementation of the agreed project to prevent unauthorized alterations by builders or other parties. This guarantees the client that the project will be executed with full structural and architectural precision.

PIER.ARCHITECTURE.DESIGN

Design Phases

01Phase 1 / Consultation, task analysis, concept design, site research
02Phase 2 / Preparation of GAP documentation and permit acquisition
03Phase 3 / Preparation of full architectural album and construction permit
04Phase 4 / Authorial supervision of the project

GAP

Development Condition Setting

Determines the functional zone and permissible use of the plot:

  • Development coefficients (e.g. K1 — density/area, number of floors or height in meters).
  • Maximum buildable area and volume.
  • Setbacks (from red line, neighboring plots, street, trees).
  • Parking, landscaping and other infrastructure requirements.
  • Restrictions (easements, protected zones, utilities, etc.).

Main advantage: After receiving the GAP (usually valid for 3 years), new laws and restrictions do not apply to your project — you know exactly what size and parameters the building can be. This is the architect's 'frame' the project cannot exceed.

Required documents:

  • Cadastral extract (Public Registry / NAPR).
  • Document confirming ownership or right of use.
  • Topographic plan (scale 1:500 or 1:1000) — now mandatory.
  • Plot photographs.
  • Photo confirming placement of information board (banner) — now mandatory.
  • Approximate placement scheme of the planned building (sketch).
  • If needed: power of attorney, technical conditions from utility services, adjacent territory study, road scheme approval, etc.

GDG

Detailed Development Plan

An urban planning document that defines in detail for a specific territory:

  • Functional sub-zones.
  • Maximum development coefficients (K1 etc.).
  • Building placement and boundaries (red/blue lines).
  • Exact placement of roads, infrastructure, green spaces and plots.
  • Complete territory planning (textual + graphic part).

Difference from GRG: GRG (Regulatory Development Plan) is more general, setting zoning and key parameters. GDG (Detailed Development Plan) is more specific and detailed — often prepared after or alongside GRG.

GRG

Regulatory Development Plan

An urban planning document that defines for a specific (larger) territory:

  • Functional zones (residential, commercial, green, mixed, etc.).
  • Development coefficients and parameters (floors, height, density).
  • Building placement rules (red line, blue line, setbacks from neighbors).
  • Infrastructure (roads, utilities, landscaping).
© 2025 Pier Studio. All rights reserved.